Proposed MRT Circle Line (MRT3)
The Circle Line MRT3 is a circular rail line planned to link the current
Klang Valley public transport system, enhancing mobility and travel
convenience for the city's expanding population. Covering 51 kilometers
around the city's outskirts, the Circle Line MRT3 is intended to connect
with existing MRT, LRT, KTM, and Monorail services via 10 well-positioned
interchange and connecting stations.
By offering alternative, shorter routes to major destinations through
various integration points, the Circle Line MRT3 will improve accessibility,
especially in areas of the city that are currently underserved.
There will be a total of 32 stations (22 elevated + 7 underground) in 51
km excluding
3 provisional stations and the 2 depots. MRT3 has 10 interchange and
connecting stations with 12 existing rail lines (LRT, MRT, KL Monorail, and
KTM), along with parking bays across 11 locations near the stations.
Construction is slated to begin in 2026, with the entire Circle Line (MRT3)
anticipated to be fully operational by 2032.
•
Bukit Kiara Selatan |
•
Setapak |
•
Jalan Yaacob Latif |
Note: All of the station names are interim and subject to change.
folder_open Main